النتائج 1 إلى 3 من 3

الموضوع: ERGON ENERGY white papers

  1. #1
    عضو فى رابطة مهندسى الكهرباء العرب الصورة الرمزية waheeb said
    تاريخ التسجيل
    Jun 2008
    الدولة
    YEMEN
    المشاركات
    747

    ERGON ENERGY white papers

    موقع تجدون فيه كل ماتحتاجون من نماذج ومواصفات الفحوصات الكهربائيه *كافة المواد يمكن تحميلها
    أرجوا منكم الدعاء لي ولوالدي بظهر الغيب ..
    *****************************
    https://www.ergon.com.au/contractors...-commissioning
    **************************************** ******
    Test and Commissioning Manual

    TITLE DE******ION PUBLISHED
    Test and Commissioning Manual Version 4.0 (783.5 KB)
    The Test and Commissioning Manual defines and describes the actions and processes to be followed when performing pre-commissioning testing and commissioning of high voltage plant, protection, control, communications and indication systems. 7 Jun 2013
    Automatic ITP and Test Report Generators

    TITLE DE******ION PUBLISHED
    Defect Reporting Tool Ver 3 (441.5 KB)
    For the purpose of entering, tracking and reporting of all defects during the progress of a project at an individual workgroup level. 24 Jun 2013
    Defect Summary Tool Ver 1 (238.5 KB)
    Allows automatic collation and summation of defect reporting tools. Provides reports based around defects per responsible centre, outstanding defects, total man hours etc. 24 Jun 2013
    Test Tool - Project Ver 5 (260.5 KB)
    Test tool for overall project commissioning status at a stage by stage level. 9 Aug 2013
    Test Tool - Substation General Ver 8 (1.1 MB)
    Test tool for standardised generation of substation secondary systems ITP’s, checklists and test reports (excluding protection relays) and all substation plant pre and post energisation checklists and test reports. 9 Aug 2013
    Test Tool - Power Transformer Ver 7 (997.5 KB)
    Test tool for standardised generation of power transformer ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - Bus Assembly Ver 6 (418.5 KB)
    Test tool for standardised generation of bus assembly ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - Circuit Breaker Ver 7 (482.0 KB)
    Test tool for standardised generation of circuit breaker ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - Current Transformer Ver 8 (1.1 MB)
    Test tool for standardised generation of current transformer ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - Isolator Earth Switch Ver 5 (351.0 KB)
    Test tool for standardised generation of isolator/earth switch ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - Voltage Transformer Ver 7 (557.0 KB)
    Test tool for standardised generation of voltage transformer ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - Surge Diverter Ver 3 (329.5 KB)
    Test tool for standardised generation of surge diverter ITP’s, checklists and test reports for the FAT and SAT phases of a substation project. 9 Aug 2013
    Test Tool - Protection Relay Ver 7 (466.0 KB)
    Test tool for standardised generation of protection relay ITP’s, checklists and test reports for the SAT and SIT phases of a substation project. 9 Aug 2013
    Test Tool - HV Cable (up to 33kV) Ver 1 (352.0 KB)
    Test tool for standardised generation of distribution HV cable ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - Transmission Cable (over 33kV) Ver 1 (585.5 KB)
    Test tool for standardised generation of transmission cable ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - Local Supply Transformer Ver 2 (328.0 KB)
    Test tool for standardised generation of local supply transformer ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - Recloser Ver 2 (370.0 KB)
    Test tool for standardised generation of recloser ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - Capacitor Bank Ver 3 (747.0 KB)
    Test tool for standardised generation of capacitor bank ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - Reactor Ver 3 (566.0 KB)
    Test tool for standardised generation of reactor ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - Ring Main Unit Ver 1 (369.0 KB)
    Test tool for standardised generation of ring main unit ITP’s, checklists and test reports for the FAT, SAT and SIT phases of a substation project. 31 Jul 2013
    Test Tool - SCADA Ver 1 (1.3 MB)
    Test tool for standardised generation of SCADA ITP’s, checklists and test reports for the SIT phase of a substation project. 31 Jul 2013
    Error Reporting for Commissioning Tools (54.0 KB)
    Template ******** to be completed and emailed to designandconstruction@ergon.com.au when errors are encountered whilst using the test and commissioning tools. 24 Jun 2013
    LV Cables

    TITLE DE******ION PUBLISHED
    SP0405 Field Test LV Underground Cable Installations SWP (63.1 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for the commissioning of low voltage underground cable installations. 25 Mar 2013
    SP0405R01 Field Test LV Underground Cable Installations JSA (55.1 KB)
    Job Safety Analysis (JSA). Purpose of this JSA is to provide instruction on the field testing of low voltage underground cable installations. 25 Mar 2013
    SP0405C03 LV Cable Inspection and Test Plan (59.5 KB)
    Inspection and test plan for LV cable. 25 Mar 2013
    SP0405C01 LV Cable Commissioning Test Report (127.5 KB)
    Test report for LV cable commissioning. 25 Mar 2013
    Distribution Substation

    TITLE DE******ION PUBLISHED
    SP0406 Commissioning Ground Mounted Distribution Substations and Switchgear SWP (33.7 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for the commissioning ground mounted distribution substations and switchgear. 25 Mar 2013
    SP0406R01 Commissioning Ground Mounted Distribution Substations and Switchgear JSA (77.9 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide instruction on the commissioning of distribution substations and switchgear. 25 Mar 2013
    SP0406C01 Commissioning Ground Mounted Distribution Substation and Switchgear Test Report, Inspection and Test Plan (205.0 KB)
    Test report, inspection and test plan for commissioning ground mounted distribution substation and switchgear (included in test report). 25 Mar 2013
    HV Cable Distribution

    TITLE DE******ION PUBLISHED
    SP0407C03 HV Cable Inspection and Test Plan (57.0 KB)
    Inspection and test plan for HV cable. 25 Mar 2013
    SP0407R02 Testing of HV Cables Supplementary Information (114.1 KB)
    This reference is intended to give a basic overview of insulating materials that can be used during high voltage withstand testing, in particular cable testing. 25 Mar 2013
    SP0407R01 Commissioning Tests for New HV Underground Cables JSA (33.8 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to identify the hazards and control measures associated with testing and commissioning new HV cables (up to 33KV). 25 Mar 2013
    SP0407 Commissioning Tests for HV Underground Cables SWP (92.1 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for pre-commissioning and commissioning tests on high voltage underground cables (up to 33KV). 25 Mar 2013
    SP0407C01 HV Cable Commissioning Test Report (188.5 KB)
    Test report for HV cable commissioning. 25 Mar 2013
    Power Transformer

    TITLE DE******ION PUBLISHED
    SP0504C07 Power Transformer Commissioning Checklist (119.5 KB)
    Commissioning checklist for power transformer. 25 Mar 2013
    SP0504C01 Power Transformer Dielectric and Insulation Test Report (94.5 KB)
    Test report for power transformer dielectric and insulation. 25 Mar 2013
    SP0504C05 Power Transformer Load Loss Test Report (141.5 KB)
    Test report for power transformer load loss. 25 Mar 2013
    SP0504C06 Power Transformer Load Loss and Impedance Test Report (1.1 MB)
    Test report for power transformer load loss and impedance. 25 Mar 2013
    SP0504C01R01 Power Transformer IR and DDF Temperature Correction Test Report (86.5 KB)
    Test report for power transformer IR and DDF temperature correction. 25 Mar 2013
    SP0504C03 Power Transformer Voltage Ratio Test Report (97.0 KB)
    Test report for power transformer voltage ratio. 25 Mar 2013
    SP0504 Power Transformer Testing SWP (62.8 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for testing power transformers. 25 Mar 2013
    SP0504C10 Power Transformer Temperature Indicator Test Report (82.5 KB)
    Test report for power transformer temperature indicator, calibration and setting. 25 Mar 2013
    SP0504C02 Power Transformer Cold Winding Resistance Test Report (107.0 KB)
    Test report for power transformer cold winding resistance. 25 Mar 2013
    SP0504R01Power Transformer Testing JSA (42.7 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to outline the requirement for performing these tests on out of service power transformers. 25 Mar 2013
    SP0504C11 Substation Power Transformer Inspection and Test Plan (66.0 KB)
    Inspection and test plan for substation power transformer. 25 Mar 2013
    SP0504C04 Power Transformer No Load Loss Test Report (80.0 KB)
    Test report for power transformer no load loss. 25 Mar 2013
    SP0504C03R01 Power Transformer Ratio Calculation Test Report (149.5 KB)
    Test report for power transformer ratio calculation. 25 Mar 2013
    Current Transformer

    TITLE DE******ION PUBLISHED
    SP0507R01 Current Transformer Testing JSA (29.4 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing current transformers. 25 Mar 2013
    SP0507C04 Current Transformer Inspection and Test Plan (66.0 KB)
    Inspection and test plan for current transformer. 25 Mar 2013
    SP0507C02 Current Transformer Test Report (Supplementary) (113.5 KB)
    Test report (supplementary) including commissioning checklist for current transformer. 25 Mar 2013
    SP0507 Current Transformer Testing SWP (53.5 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for testing current transformers used for substation protection and indication systems. 25 Mar 2013
    SP0507C01 Current Transformer Test Report (167.0 KB)
    Test report for current transformer. 25 Mar 2013
    Voltage Transformer

    TITLE DE******ION PUBLISHED
    SP0508C01 Voltage Transformer Test Report (84.0 KB)
    Test report for voltage transformer. 25 Mar 2013
    SP0508C02 Voltage Transformer Test Report (Supplementary) (84.5 KB)
    Test report (supplementary) including commissioning checklist for voltage transformer. 25 Mar 2013
    SP0508 Voltage Transformer Testing SWP (34.1 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to provide guidelines for testing capacitive and magnetic voltage transformers. 25 Mar 2013
    SP0508C04 Voltage Transformer Inspection and Test Plan (61.5 KB)
    Inspection and test plan for voltage transformer. 25 Mar 2013
    SP0508R01 Voltage Transformer Testing JSA (30.1 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing capacitive and magnetic voltage transformers. 25 Mar 2013
    Circuit Breaker

    TITLE DE******ION PUBLISHED
    SP0509C02 Circuit Breaker HV Withstand Test Report (83.5 KB)
    Test report for circuit breaker HV withstand. 25 Mar 2013
    SP0509C04 Circuit Breaker Inspection and Test Plan (61.5 KB)
    Inspection and test plan for circuit breaker. 25 Mar 2013
    SP0509R01 Circuit Breaker Testing JSA (32.0 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing circuit breakers. 25 Mar 2013
    SP0509 Circuit Breaker Testing SWP (34.6 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to provide guidelines for testing circuit breakers. 25 Mar 2013
    SP0509C01 Circuit Breaker Test Report (80.5 KB)
    Test report for circuit breaker. 25 Mar 2013
    Earthmat

    TITLE DE******ION PUBLISHED
    SP0510C03 Earth System Step and Touch Test Report (145.5 KB)
    Test report for earth system step and touch. 25 Mar 2013
    SP0510C06 Earth System Inspection and Test Plan (60.5 KB)
    Inspection and test plan for earth system. 25 Mar 2013
    SP0510C02R01 Earth System Voltage Gradient End Point Test Report (72.0 KB)
    Test report for earth system voltage gradient end point. 25 Mar 2013
    SP0510R01 Substation Earth Testing JSA (39.4 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to identify the hazards and control measures associated with measuring step and touch potentials and measuring earthmat resistance using the remote injection method. 25 Mar 2013
    SP0510C04 Earth Resistivity Test Report (118.5 KB)
    Test report for earth resistivity. 25 Mar 2013
    SP0510C01 Earth System Current Distribution Test Report (87.0 KB)
    Test report for earth system current distribution. 25 Mar 2013
    SP0510C02 Earth System Voltage Gradient Test Report (86.0 KB)
    Test report for earth system voltage gradient. 25 Mar 2013
    SP0510C03R01 Earth System Step and Touch Analysis Test Report (1.2 MB)
    Test report for earth system step and touch analysis. 25 Mar 2013
    SP0510 Substation Earth System Injection Testing SWP (71.2 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe implementing an 'Earth System Injection Test' for the purpose of determining the current distribution, earth potential rise (EPR) and personnel safety at a particular site. 25 Mar 2013
    Transformer Primary Injection

    TITLE DE******ION PUBLISHED
    SP0511C01R02 Transformer Primary Injection Calculation Spreadsheet (YNd) (69.0 KB)
    Calculation spreadsheet for transformer primary injection - YNd transformer. 25 Mar 2013
    SP0511C01R04 Transformer Primary Injection Connection Schedule (276.5 KB)
    Connection schedule for transformer primary injection. 25 Mar 2013
    SP0511C01R01 Transformer Primary Injection Calculation Spreadsheet (Dyn) (63.5 KB)
    Calculation spreadsheet for transformer primary injection - Dyn transformer. 25 Mar 2013
    SP0511R01 Circuit Breaker Testing JSA (28.6 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for carrying out primary injection testing of a power transformer. 25 Mar 2013
    SP0511 Transformer Primary Injection Testing SWP (34.6 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for carrying out a primary injection test on a power transformer. 25 Mar 2013
    SP0511C01 Transformer Primary Injection Test Report (126.5 KB)
    Test report for transformer primary injection. 25 Mar 2013
    SP0511C01R03 Transformer Primary Injection Calculation Spreadsheet (Ynynd or Ya0d) (59.5 KB)
    Calculation spreadsheet for transformer primary injection - Ynynd or Ya0d transformer. 25 Mar 2013
    Surge Diverters

    TITLE DE******ION PUBLISHED
    SP0512 Surge Diverter Testing SWP (30.3 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for testing surge diverters. 25 Mar 2013
    SP0512C03 Surge Diverter Testing Inspection and Test Plan (58.5 KB)
    Inspection and test plan for surge diverter testing. 25 Mar 2013
    SP0512R01 Surge Diverter Testing JSA (30.1 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing and commissioning surge diverters. 25 Mar 2013
    SP0512C01 Surge Diverter Test Report (85.0 KB)
    Test report for surge diverter testing. 25 Mar 2013
    Capacitor Banks

    TITLE DE******ION PUBLISHED
    SP0513C01 Capacitor Banks Test Report (153.5 KB)
    Test report for capacitor banks. 25 Mar 2013
    SP0513C04 Capacitor Bank Inspection and Test Plan (63.0 KB)
    Inspection and test plan for capacitor banks. 25 Mar 2013
    SP0513 Capacitor Bank Testing SWP (49.4 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to provide guidelines for testing capacitor banks. 25 Mar 2013
    SP0513R01 Capacitor Bank Testing JSA (30.5 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing and commissioning capacitor banks. 25 Mar 2013
    SP0513C02 Capacitor Banks Test Report (Supplementary) (153.5 KB)
    Test report (supplementary) and commissioning checklist for capacitor banks. 25 Mar 2013
    Isolator / Earth Switch

    TITLE DE******ION PUBLISHED
    SP0514 Isolator and Earth Switch Testing SWP (34.5 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for testing of isolators and earth switches. 25 Mar 2013
    SP0514R01 Isolator and Earth Switch Testing JSA (32.0 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing of isolators and earth switches. 25 Mar 2013
    SP0514C01 Isolator and Earth Switch Test Report (103.5 KB)
    Test report for isolatora and earth switches. 25 Mar 2013
    SP0514C03 Isolator and Earth Switch Inspection and Test Plan (57.0 KB)
    Inspection and test plan for isolators and earth switches. 25 Mar 2013
    Bus Assembly

    TITLE DE******ION PUBLISHED
    SP0515R01 Bus Assembly Testing JSA (32.1 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to provide guidelines for testing of high voltage bus assemblies. 25 Mar 2013
    SP0515 Bus Assembly Testing SWP (34.6 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for testing high voltage bus assemblies. 25 Mar 2013
    SP0515C01 Bus Assembly Test Report (125.5 KB)
    Test report for bus assembly. 25 Mar 2013
    SP0515C03 Bus Assembly Inspection and Test Plan (28.1 KB)
    Inspection and test plan for bus assembly. 25 Mar 2013
    Protection Relay

    TITLE DE******ION PUBLISHED
    SP0518C01 Protection Relay Inspection and Test Plan (65.5 KB)
    Inspection and test plan for protection relays. 25 Mar 2013
    SP0518 Protection Relay Testing for Commissioning SWP (189.4 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for testing of protection relays for commissioning purposes. 25 Mar 2013
    On Load Tests

    TITLE DE******ION PUBLISHED
    MN000301F126 Bus Zone On Load Measurement Test Report (143.5 KB)
    Test report for bus zone on load measurement. 25 Mar 2013
    MN000301F125 On Load Measurement (General) Test Report (167.5 KB)
    Test report for on load measurement (general). 25 Mar 2013
    MN000301F127 Transformer On Load Measurement Test Report (177.5 KB)
    Test report for transformer on load measurement. 25 Mar 2013
    MN000301R102 On Load and Directional Verification Tests Reference Manual (124.1 KB)
    The aim of this reference manual is to provide explanatory information and clarify the on load testing requirements of commissioning new and augmented HV plant. 25 Mar 2013
    Reclosers

    TITLE DE******ION PUBLISHED
    SP0233C01 3 Phase Recloser Test Report (87.0 KB)
    Test report for 3 phase recloser. 25 Mar 2013
    SP0233C02 SWER Recloser Test Report (82.0 KB)
    Test report for SWER recloser. 25 Mar 2013
    SP0233C08 Schneider Automatic Circuit Recloser Inspection and Test Plan (76.0 KB)
    Inspection and test plan for Schneider automatic circuit recloser. 25 Mar 2013
    SP0233 Schneider Automatic Circuit Recloser SWP (112.1 KB)
    Standard Work Practice (SWP). The purpose of this SWP is to standardise and prescribe the method for tests associated with N and W series Schneider automatic circuit reclosers. 25 Mar 2013
    SP0233R01 Schneider Automatic Circuit Recloser JSA (70.6 KB)
    Job Safety Analysis (JSA). The purpose of this JSA is to describe the tests to be carried out before accepting a new or repaired N and W series Schneider automatic circuit recloser. 25 Mar 2013
    Panels

    TITLE DE******ION PUBLISHED
    MN000301R166 Construction and Wiring Guidelines for Ergon Energy Substation Panels (473.5 KB)
    These guidelines outline the requirements for acceptance of construction and wiring of control, protection, communications, metering and auxiliary equipment panels within Ergon Energy substations. 25 Mar 2013
    MN000301R167 Greenlining and Bluelining of Ergon Energy Substation Drawings (1.2 MB)
    This ******** outlines the requirements for continuity and function testing of control, protection, metering, communications and auxiliary equipment panels within Ergon Energy substations. 25 Mar 2013
    Related links
    وهيب م سعيد

  2. #2
    Junior Engineer
    تاريخ التسجيل
    Jan 2016
    الدولة
    morocco
    المشاركات
    3

    رد: ERGON ENERGY white papers

    الله يعطيك الصحة و يغفرلك و لوالديك

  3. #3
    Junior Engineer
    تاريخ التسجيل
    Jul 2011
    الدولة
    سوريا
    المشاركات
    15

    رد: ERGON ENERGY white papers

    الله يعطيك الصحة و يغفرلك و لوالديك

معلومات الموضوع

الأعضاء الذين يشاهدون هذا الموضوع

الذين يشاهدون الموضوع الآن: 1 (0 من الأعضاء و 1 زائر)

المواضيع المتشابهه

  1. ملف عن مواصفات المحطات التوزيع من شركة ergon
    بواسطة اردلان عمر رسول في المنتدى قسم صيانة المعدات الخاصة بمحطات التحويل Switchgear
    مشاركات: 5
    آخر مشاركة: 06-09-13, 10:55 PM
  2. Very Useful Papers about Solar and wind renewable energy and their studies in egypt..
    بواسطة ibtihal.zahran في المنتدى قسم طاقة الرياح و الطاقة الشمسية Solar and wind Energy
    مشاركات: 1
    آخر مشاركة: 05-06-13, 06:08 PM
  3. سلسلة white paper
    بواسطة Eng mohammed elsayed في المنتدى قسم وقاية نظم القوى الكهربائية Power System Protection
    مشاركات: 3
    آخر مشاركة: 20-11-11, 10:46 PM
  4. testing ct and vt by ergon co.
    بواسطة اردلان عمر رسول في المنتدى قسم صيانة المعدات الخاصة بمحطات التحويل Switchgear
    مشاركات: 0
    آخر مشاركة: 12-06-10, 12:48 PM
  5. طلب برنامج white smoke
    بواسطة جواد العبودي في المنتدى قسم اللغة الإنجليزية English Learning
    مشاركات: 1
    آخر مشاركة: 31-03-10, 12:03 PM

المفضلات

المفضلات

ضوابط المشاركة

  • لا تستطيع إضافة مواضيع جديدة
  • لا تستطيع الرد على المواضيع
  • لا تستطيع إرفاق ملفات
  • لا تستطيع تعديل مشاركاتك
  •  

 

 

Flag Counter